Breaking
Sound Transit: Pinehurst Station opens Sept. 30 with 1 and 2 Line connectionsWSDOT: I-5 express lanes closed Sept. 11-14 for Ship Canal Bridge work2 Line: shuttle buses replacing trains, South Bellevue to Overlake VillageSeahawks open the season 13-10 over New EnglandSound Transit: Pinehurst Station opens Sept. 30 with 1 and 2 Line connectionsWSDOT: I-5 express lanes closed Sept. 11-14 for Ship Canal Bridge work2 Line: shuttle buses replacing trains, South Bellevue to Overlake VillageSeahawks open the season 13-10 over New England
Transit

Pinehurst Station set to open Sept. 30, linking NE 130th to the 1 and 2 Lines

Sound Transit says the infill station will put North Seattle riders within a short walk of trains running every four to five minutes.

By Steve Hickey3 min read
Editorial photo illustration: a North Seattle light rail platform.
Editorial photo illustration: a North Seattle light rail platform. · NW News Watch photo illustration
100%

Sound Transit says Pinehurst Station will open on Sept. 30, 2026, adding a new North Seattle stop along the NE 130th Street corridor and giving riders a direct connection to both the 1 Line and the 2 Line.

The agency describes the stop as an infill station: a platform added to track that trains already run on, built to serve neighborhoods that were passed over when the original alignment opened. According to Sound Transit's announcement, riders should expect trains roughly every four to five minutes during regular service.

Why an infill station matters here

Neighborhoods near NE 130th sit between existing stations, which has meant a bus trip or a long walk to reach the train. A station on the corridor shortens that first and last mile, and it gives east-west bus routes a rail transfer point that did not exist before.

An infill station is the rare transit project that changes a commute without laying new track.

This report is based on Sound Transit's public news release. NW News Watch has not independently verified construction schedules or service plans beyond that material.

What we know

  • Sound Transit has publicly announced a Sept. 30, 2026 opening date.
  • The station is described as connecting the NE 130th corridor to the 1 and 2 Lines.
  • The agency cites expected train frequency of four to five minutes.

What we don't know

  • How bus routes will be restructured around the new station.
  • Opening-day ridership, parking and access details beyond the release.

Map / embed slot

Drop a map embed for this location in the newsroom editor.

Sources & attribution

Written from Sound Transit's published news release. No independent on-scene reporting.

Request a correction

Next story

Example: how the new transit map fits together

More coverage

All